Back in August when the materials were chosen, it seemed like the plan for the bathroom renovation was set. Since then we changed the design and dropped some materials (glass tile and shower bench) to lower the cost. Then came the long wait for approval from the building.
Months.
Here was a sketch (bad and only copy) of the shower.
And here it is coming together!
There will be LOTS of cleanup.


